Applying ISO:31000:2018 as Risk Management Strategy on Heavy Machinery Vehicle Division

Ananto Yusuf Wicaksono

Abstract

The operation of heavy machinery vehicles and extensive project site areas are constrained in a general contractor services business, they need risk management to overcome obstacles that interfere project.. Transporting heavy machinery vehicles from one project location to another project site using low bed movers have a risk. Ideal condition for company heavy machinery vehicle with minimum transport. Despite their completion to represent low budget to manage project, it mitigation time, embarkation and debarkation is a challenge too. The aim of this research is to observe level of effectiveness in applying ISO 31000:2018 risk management standard in heavy machinery operations. We apply expert judgment in risk assessment techniques using questioner. This was distributed to respondents who had experience operating heavy machinery vehicles for at least 3 years. Heavy machinery vehicle operators must have enough experience and maintenance of heavy machinery just conduct routinely based on a manual book. From the results of risk identification,  there are 20 risks. Based on the results of the risk assessed from probability and impact variables, damaged risk to the undercarriage parts (R12)  as a top priority treatment risk. Risk management will be identified as mitigation strategies based on 5 aspects. They are avoided risk, risk control, separating risk, moving risk and accepting risk. Results of identification from treatment strategies will be assessed based on mitigation duration and mitigation costs, to find out the most optimal strategy for dealing with these risks. It can concluding assessment of risk management strategies well, if mitigation strategies separate risks. is the most optimal mitigation strategy.

Keywords

General Contractor; Heavy Machinery Vechile; ISO 31000:2018; Management Risk; Mitigation.

Full Text:

PDF

References

M. Munir, M. S. Sadiq Jajja, K. A. Chatha, and S. Farooq, ‘Supply Chain Risk Management and Operational Performance: The Enabling Role of Supply Chain Integration’, Int. J. Prod. Econ., p. 107667, 2020, doi: https://doi.org/10.1016/j.ijpe.2020.107667.

M. A. Ekemen and S. Harun, ‘Data in brief Dataset on social capital and knowledge integration in project management’, no. February, pp. 1–6, 2020, doi: 10.1016/j.dib.2020.105233.

J. Young, ‘Risk management’, Aviat. Week Sp. Technol. (New York), vol. 165, no. 5, pp. 44–45, 2018.

Y. Ozturkoglu, Y. Kazancoglu, and Y. D. Ozkan-Ozen, ‘A sustainable and preventative risk management model for ship recycling industry’, J. Clean. Prod., vol. 238, p. 117907, 2019, doi: https://doi.org/10.1016/j.jclepro.2019.117907.

Y. Jung, S. Kang, Y.-S. Kim, and C. Park, ‘Assessment of safety management information systems for general contractors’, Saf. Sci., vol. 46, no. 4, pp. 661–674, 2008, doi: https://doi.org/10.1016/j.ssci.2007.06.009.

R. Picciotto, ‘Towards a “New Project Management” movement? An international development perspective’, Int. J. Proj. Manag., 2019, doi: https://doi.org/10.1016/j.ijproman.2019.08.002.

R. F. de Toledo, H. L. Miranda Junior, J. R. Farias Filho, and H. G. Costa, ‘A scientometric review of global research on sustainability and project management dataset’, Data Br., vol. 25, p. 104312, 2019, doi: 10.1016/j.dib.2019.104312.

C. M. Meyer and E. L. G. Torres, ‘Success Factors for Supply Chain Management Projects: An Empirical Analysis’, IFAC-PapersOnLine, vol. 52, no. 13, pp. 153–158, 2019, doi: 10.1016/j.ifacol.2019.11.168.

B. Koke and R. C. Moehler, ‘Earned Green Value management for project management: A systematic review’, J. Clean. Prod., vol. 230, pp. 180–197, 2019, doi: https://doi.org/10.1016/j.jclepro.2019.05.079.

H. Yang, H. Li, Z. Zhang, M. Zhan, J. Liu, and G. Li, ‘Advances and trends on tube bending forming technologies’, Chinese J. Aeronaut., vol. 25, no. 1, pp. 1–12, 2012, doi: 10.1016/S1000-9361(11)60356-7.

DOI

https://doi.org/10.21107/ijseit.v4i2.6871

Metrics

Refbacks

  • There are currently no refbacks.


Copyright (c) 2020 Ananto Yusuf Wicaksono

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.