Studi Perencanaan Sistem Instalasi Penerangan Jalan pada Jembatan Bentang Panjang di Indonesia (Studi Kasus pada Jembatan Suramadu)
Abstract
Voltatau 0,05 %.If using ETAP Software, this system results voltage drop equal as 0,011
Volt atau 0,05503 %. Finally electrical power suppl y system on Suramadu Bridge have approved with voltage drop requirements according with PLN recommends equal as 5%.
Full Text:
PDFReferences
Andang Subaharianto, dkk, 2004, Ma dura Bicara PLTN, UPT Penerbitan Universitas Jember, }ember
Abdul Kadir, 1980, Pengantar Teknik Tenaga Listrik, LP3ES,Jakarta.
Anonemous, 1993,Lighting Manual, Fifth Edition, PT. Philips Indonesia.
Anonemous, 2004, Proposal Lampu Penerangan Jalan UmumKota Malang, PT. Philips Lighting.
Anonemous, 2000, Proposal Penerangan Lampu PJU Kabupaten Gresik, PT Philips
Anonemous, 2003, Basic Ligthing & Pro duct Knowledge, PT Philips Ralin Electronics, Cikampek.
Anonemous, 1997, Kalatog Lampu, Armatur dan Komponen PHIUPS, PT. Philips Ralin Electronic, Jakarta.
Anonemous,2004/2005,Philips Lighting Cataloque, PT. Philips Indonesia, Asean.
Mohammad Nuh, Tanpa Tahun, Peren canaan Sistem Kelistrikan pada Kampus ITS, ITS Surabaya.
Tim PT. PLN (Persero) Distribusi Jatim, 1997, Teori Listrik, Pelatihan Tenaga Ahli Kontraktor Listrik, Surabaya
Van Harten, Paul., diterjemahkan .E. Setiawan Ir, 1985, Instalasi Listrik Kuat Arus 2, Bina Cipta Bandu
DOI
https://doi.org/10.21107/rekayasa.v1i1.2165Metrics
Refbacks
- There are currently no refbacks.
Copyright (c) 2008 Amirulah Amirulah
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.