The use of temporary towers is a solution to shorten the outage time. Temporary Tower is used as a tool in reconductoring work and tower replacement. The study by calculating the Budget Plan Cost (RAB) and schedule analysis using Microsoft Project Application to determine the comparative duration of time required to complete the reconductoring work and tower replacement between using temporary tower and without temporary tower. From the time schedule created, it will be known which work method uses a shorter duration of time so that it can save or speed up the outage time. This study will produce what kind or type of conductor is appropriate in the context of replacing conductors or reconductoring SUTT 150 kV A - C, resulting in a reconductoring and tower replacement work schedule that is 15 days faster when using a temporary tower and reduces the outage time by about 132 days or about -89%. However, it requires an additional cost of Rp 1,872,217,454, which is still much smaller than the loss due to outages if the work is not done with a temporary tower.

Keywords

capacity, investment, outage, reliability, transmission

References

Ahmed, U. and Saqib, M.A. (2020) ‘Prospect of voltage uprating of a conservatively designed EHV transmission line’, Electric Power Systems Research, 182. Available at: https://doi.org/10.1016/j.epsr.2020.106203.

Ines, H. and Ammar, F. Ben (2020) ‘Multi-criteria decision making for reconductoring overhead lines’, in Proceedings of the 17th International Multi-Conference on Systems, Signals and Devices, SSD 2020. Institute of Electrical and Electronics Engineers Inc., pp. 53–58. Available at: https://doi.org/10.1109/SSD49366.2020.9364080.

Kishore, T.S. and Singal, S.K. (2014) ‘Optimal economic planning of power transmission lines: A review’, Renewable and Sustainable Energy Reviews. Elsevier Ltd, pp. 949–974. Available at: https://doi.org/10.1016/j.rser.2014.07.125.

Kopsidas, K. and Rowland, S.M. (2009) ‘A performance analysis of reconductoring an overhead line structure’, IEEE Transactions on Power Delivery, 24(4), pp. 2248–2256. Available at: https://doi.org/10.1109/TPWRD.2009.2021042.

Mbuli, N. et al. (2019) ‘A literature review on capacity uprate of transmission lines: 2008 to 2018’, Electric Power Systems Research, 170, pp. 215–221. Available at: https://doi.org/10.1016/j.epsr.2019.01.006.

Ms. Darshana P. Khandare, Dr.M.R.N. (2021) ‘Prepare Project Schedule using Microsoft Project’, International Journal of Research Publication and Reviews, 2(8), pp. 233–245.

Wale, P.M (2015) ‘Planning and Scheduling of Project using Microsoft Project (Case Study of a building in India)’, IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE), 12(3), pp. 56–63.

PT PLN (Persero) Unit Induk Pusat Pengatur Beban (2019) Kajian Kelayakan Proyek Pembangunan GITET 500 kV Cibatu Baru II/Sukatani Beserta Outlet Terkait (Revisi ke-1). 23.03/2019.10/132. Depok.

Rashmi, Shivashankar, G.S. and Poornima (2017) ‘Overview of different overhead transmission line conductors’, in Materials Today: Proceedings. Elsevier Ltd, pp. 11318–11324. Available at: https://doi.org/10.1016/j.matpr.2017.09.057.

Reddy, B.S. and Chatterjee, D. (2016) ‘Analysis of High Temperature Low Sag Conductors Used for High Voltage Transmission’, in Energy Procedia. Elsevier Ltd, pp. 179–184. Available at: https://doi.org/10.1016/j.egypro.2016.11.183.

Reed, L. et al. (2020) ‘Expanding Transmission Capacity: Examples of Regulatory Paths for Five Alternative Strategies’, Electricity Journal, 33(6). Available at: https://doi.org/10.1016/j.tej.2020.106770.

Riba, J.R. et al. (2020) ‘Uprating of transmission lines by means of HTLS conductors for a sustainable growth: Challenges, opportunities, and research needs’, Renewable and Sustainable Energy Reviews. Elsevier Ltd. Available at: https://doi.org/10.1016/j.rser.2020.110334.

Vadivel, Karthi.K. (2017) ‘Emergency Restoration of High Voltage Transmission Lines’, The Open Civil Engineering Journal, 11(1), pp. 778–785.

DOI

https://doi.org/10.21107/rekayasa.v16i2.21105

Metrics

Refbacks

  • There are currently no refbacks.


Copyright (c) 2023 Muhammad Iqbal, Haryo Dwito Armono, Haryo Dwito Armono

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.