Innovative Technologies in Construction Project Management for Performance Improvement

Muhammad Waheed

Abstract

Construction delays are becoming the most important issue facing all organizations in the construction industry. The majority of building projects in Pakistan are dealing with a similar issue. The goals of the organizations involved in construction firms, including the client, contractor, consultant, management, and others, are to finish the work within the allotted time frame, within the allocated funds, and with high-quality results. Construction projects are heavily influenced by delays; if individuals are unaware of the reasons behind the delays, they will not be successful. The purpose of this study is to identify the causes that cause delays so that the organizations can enhance the project's success. To determine the duration issues, the construction group members—owners, contractors, consultants, engineers, etc.—are surveyed using a questionnaire.

Keywords

delay factors, contractor, engineer, consultant, owner

Full Text:

PDF

References

Megha Desai and Rajiv Bhatt, “Critical Causes of Delayin Residential Construction Projects: Case study of

Central Gujarat Region of India.”

Ashwini A. Patil and Rahul S. Patil, “Identification of

Critical Construction Delay Factors”.Zarina Alias, E.M.A. Zawawi, Khalid Yusuf, Aris, NM),“Determining Critical Success factors of Project Management Practice: A conceptual framework”,(2014).

Danial F. Oferi,”Project Management Practices and

Critical Success Factors-A Developing Country Perspective”.

A.W.Shaikh, M.R. Muree and A.S. Soomro,

“Identification of Critical Delay Factors in

Construction”, (2010).

DOI

https://doi.org/10.21107/ijseit.v8i1.23044

Metrics

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Muhammad Waheed

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.