Reability Analysis and Scedulling Preventive Maintenance for Spray Dryer Machine

Nushron Ali Mukhtar

Abstract

The activity of implementing proper machine maintenance is a must in a company. PT Arwana Citramulia Tbk is a company that produces ceramic tiles. The machine used is a spray dryer machine. The company aims to determine whether there is a schedule or time interval for machine maintenance. The method used is (RCM) Reliability Centered Maintenance. RCM is a process for determining the actions that must be taken so that the system is in good condition. Components are reviewed from FMEA (Failure Mode and Effect Analysis). The risk assessment is obtained from calculating the RPN (Risk Priority Number), then determining the distribution of each component. Calculation of MTTR and MTBF values, and finally determines the maintenance time interval. From the FMEA results, three risk priority components were obtained, namely the nozzle, piston pump, and vibration filter slip tank. Maintenance intervals on the nozzle component with a maintenance interval of 694 hours , piston pump with a maintenance interval of 758 hours, vibration filter slip tank with a maintenance interval of 292 hours per year. The results of this study indicate that there are three components that have a high failure rate and must receive scheduled maintenance to reduce the failure of the spray diyer machine

Keywords

Spray driyer, FMEA, RCM

Full Text:

PDF

References

Assauri, S. (2004). Machine Maintenance Purpose . Jakarta: Rajawali Press.

Anon. , ( 2006.) Reliability Centered Maintenance, Det Norske Veritas (DNV) Managing Risk, www.dnv.com

Berger, D. (2007). Advanced failure analysis methodologies and techniques .

Daryus, A. (2007). Machine maintenance management. Jakarta: Suryabrata .

Gaspersz, V. (1998). Total productivity management: global business productivity improvement strategies. Gramedia Pustaka Utama, Jakarta , 1–311.

Gumayri, Y., Djunaidi, M., & Sufa, MF (2014). Implementation of a Maintenance System Using the Reliability Centered Maintenance (Rcm) Method on the LSL-4 Loom Machine (Case Study: PT. Dasaplast Nusantara) . Muhammadiyah Surakarta university.

Lukodono, RP, Pratikto, P., & Soenoko, R. (2013). Analysis of the Application of the RCM and MVSM Methods to Increase the Reliability of the Maintenance System (Case Study of PG. X). Journal of Mechanical Engineering , 4 (1), 43–52.

Mukhtar, MNA, & Kusuma, A. (2019). WTP MACHINE PERFORMANCE ANALYSIS USING FMEA METHOD AND PREVENTIVE MAINTENANCE SCHEDULING. TIME: UNIPA Journal of Engineering , 17 (1), 15–25.

Pranoto, H. (2015). Reliability Centered Maintenance. Jakarta: Mitra Wacana Media.

Patrick D. T. 2001. Practical Reliability Engineering, Fourth Edition, Jonh Wiley & Sons Ltd. England.

DOI

https://doi.org/10.21107/ijseit.v7i1.17678

Metrics

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Nushron Ali Mukhtar

Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.