Project Development Management of Rungkut Tower Apartments with Critical Path Method Approach and Pert
Abstract
The lack of attention to the harmful gas such as karbonmonoksida (CO) and particulate matter (PM10) dust can give impact to the environment and living creatures that inhale it. With increasing industry the greater the level of air pollution. Monitoring the air condition industry is generally done by placing the sensor at certain points so inefficient and throwing out a lot of costs. Therefore it needs a tool that can monitor the State of the air in places hard that cannot be reached by a human being implemented on the Unmanned Aerial Vehicle (UAV). Unmanned Aerial Vehicle (UAV) or quadcopter is one of the types of aircraft used to fly and can move automatically in accordance with the navigation system based on compass and positioning of Global Positioning System (GPS) waypoint called so quadcopter can run automatically without the remote. The use of karbonmonoksida gas sensor (MQ-7) and sensor dust particles (GP2Y1010AU0F) can help quadcopter to automatic air condition monitoring. Testing the results of monitoring carried out by comparing the measuring tool on Dinas Lingkungan Hidup Provinsi Jawa Timur as a reference. The data generated from gas sensor MQ-7 and the dust sensor GP2Y1010AU0F emailed using telemetry 915 MHz are then processed on the PC/Laptop using fuzzy sugeno method to determine the output of air quality. The test results showed the average error monitoring for gas karbonmonoksida 3.31% and 8.47% of the dust particles. And a waypoint error of 2-5 meters.
Keywords
Full Text:
PDFReferences
Soeharto, I. 1999. Manajemen Proyek (Dari Konseptual Sampai Operasional) Edisi Kedua Jilid 1. Penerbit Erlangga. Jakarta.
Kerzner, H. 1995 Project Management: A system approach to planning, scheduling, and controlling, 5th Edition, Van Nostrand Reinhold, New York.
Kickpatrick, L. 1972. Optimalisasi Pelaksanaan Proyek Dengan Metode Pert dan CPM
Maharesi. 2002. Penjadawalan Proyek dengan Menggabungkan metode Pert dan CPM, Proceedings, Komputer Sistem Intelejen (KOMMIT), Jakarta.
Meredith, R. 2006. Management Teams: Why they succeed or fail, Butterworth-Heinemann, Oxford.
Siswanto. 2007. Operation Research Jilid II. Jakarta: Penerbit Erlangga. Jakarta.
Soeharto,.1995. Manajemen Proyek Dari Konseptual Sampai Operasional. Penerbit Erlangga Jakarta.
Aminurrahman, M. 2014. Manajemen proyek pembangunan gedung laboratorium UTM dengan pendekatan critical path method. Fakultas Teknik Universitas Trunojoyo Madura.
Sahid, D.S.S. 2012. Implementasi Critical Path Method dan PERT Analysis pada Proyek Global Technology for Local Community. Jurnal teknologi Informasi dan Telematika. Vol. 5: 14-22.
Dannyanti, E. 2010. Optimalisasi Pelaksanaan Proyek Dengan Metode PERT dan CPM. Fakultas Ekonomi Univiersitas Diponegoro Semarang.
Santoso, B. 2009. Manajemen Proyek Konsep dan Implementasi. Penerbit oleh Graha Ilmu Yogyakarta.
Sugiyono. 2011. Metode Penelitian Kuantitatif Kualitatif dan R&D. Edisi 13, Alfabeta. Bandung.
Handoko, H. 2001. Manajemen Personalia dan Sumber Daya Manusia, BPFE, Yogyakarta.
Hayun, A. 2005. “Perencanaan dan Pengendalian Proyek dengan Metode PERT-CPM: Studi Kasus Fly Over Ahmad Yani, Karawang”, Journal The Winners, Vol. 6, No. 2, pp. 155- 174
Jay, H. dan Barry, R. 2005. Operations Management. Edisi Ketujuh. Terjemahan Setyoningsih, Dwianoegrahwati dan Alhamdy, Indra. Jakarta: Salemba Empat.
Suputra, I.G.N.O. 2011. Penjadwalan Proyek dengan Precedence Diagram Method (PDM) dan Ranked Position Weight Method RPWM). Jurnal Ilmiah Teknik Sipil. 15(1). 18-28.
Yudha, G. A. Pujiraharjo, A. Saifoe, E.U. 2012. Analisis Multiple Resource pada Proyek Kontruksi dengan Metode Jumlah Kuadrat Kecil. Jurnal Rekayasa Sipil. 6(2): 188-198.
DOI
https://doi.org/10.21107/ijseit.v3i2.6544Metrics
Refbacks
Copyright (c) 2020 International journal of science, engineering, and information technology
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.